From intrusive survey to statutory sign-off, we deliver every stage of cladding remediation under one accountable team — including the UK's most heavily regulated higher-risk buildings.
How we deliver
Every scheme follows our proven delivery framework, with progressive fire-engineer sign-off and a complete, auditable record of information from day one to handover.
Intrusive investigations, FRAEW review and full design management with compliance checks against Building Regulations.
Evidence-complete BSR applications for higher-risk buildings — submitted right first time to protect your programme.
Elevation-by-elevation removal of combustible systems, top-down, with daily removal of materials from site.
Certified A1 / A2-s1,d0 rainscreen systems with full cavity barriers, firestopping and weatherproofing.
Progressive sign-off, warranty inspections and a complete golden thread handover at completion.
BSR Government Gateway
The Building Safety Regulator's Gateway process demands rigorous, evidenced compliance at every step. Our systems were built for it:
Live schemes delivered under full BSR oversight.
The UK's first Cladding Safety Scheme project on site.
Residents first
Nearly every building we remediate is fully occupied. That shapes everything we do:
Technical assurance
Systems
Euroclass A1 or A2-s1,d0 rainscreen systems, non-combustible insulation, and cavity barriers at every compartment line, party wall and opening — in line with FRAEW recommendations and the fire engineer's design.
Digital delivery
Trimble Viewpoint and Field View give office and site teams one source of truth — drawings, inspections, snags and sign-offs captured digitally to satisfy the BSR's golden thread requirements.
Quality
Project-specific quality plans guide inspections by floor and elevation. Photographs, product records and closed-out checks build towards a clear handover pack with certification, warranties and as-built drawings.
We'll review your FRAEW, survey the building and give you a straight answer on scope, cost and programme.