Remediation without decanting the building.

From intrusive survey to statutory sign-off, we deliver every stage of cladding remediation under one accountable team — including the UK's most heavily regulated higher-risk buildings.

How we deliver

Five stages, one accountable team, one audit trail.

Every scheme follows our proven delivery framework, with progressive fire-engineer sign-off and a complete, auditable record of information from day one to handover.

Survey & Design

Intrusive investigations, FRAEW review and full design management with compliance checks against Building Regulations.

Gateway 2

Evidence-complete BSR applications for higher-risk buildings — submitted right first time to protect your programme.

Safe Strip

Elevation-by-elevation removal of combustible systems, top-down, with daily removal of materials from site.

Reinstate

Certified A1 / A2-s1,d0 rainscreen systems with full cavity barriers, firestopping and weatherproofing.

Gateway 3

Progressive sign-off, warranty inspections and a complete golden thread handover at completion.

BSR Government Gateway

First to site under the Cladding Safety Scheme.

The Building Safety Regulator's Gateway process demands rigorous, evidenced compliance at every step. Our systems were built for it:

  • Formal competence management — SKEB assessments for every designer, consultant and dutyholder
  • Documented change control governing all design and construction-stage modifications
  • Golden Thread information repository maintained across the full project lifecycle
  • Regular compliance reviews against Building Regulations and project-specific obligations
  • A 'Stop and Challenge' culture empowering everyone on site to raise concerns
Completed recladding to an occupied block

HRB Experience

Live schemes delivered under full BSR oversight.

CSS Pioneer

The UK's first Cladding Safety Scheme project on site.

CBG site team and encapsulated scaffold

Residents first

The building stays home while we work.

Nearly every building we remediate is fully occupied. That shapes everything we do:

  • A dedicated Resident Liaison Officer on every scheme, appointed at project commencement
  • Individual resident assessments, project information packs and a resident charter
  • Complaints answered within three working days, and access maintained at all times
  • Strict working hours, considerate scaffold design, CCTV and secure access control
  • Fire escape routes kept clear and the building's fire strategy protected throughout

Technical assurance

A golden thread your assessor can actually follow.

Systems

Certified materials only

Euroclass A1 or A2-s1,d0 rainscreen systems, non-combustible insulation, and cavity barriers at every compartment line, party wall and opening — in line with FRAEW recommendations and the fire engineer's design.

Digital delivery

A live common data environment

Trimble Viewpoint and Field View give office and site teams one source of truth — drawings, inspections, snags and sign-offs captured digitally to satisfy the BSR's golden thread requirements.

Quality

Progressive sign-off

Project-specific quality plans guide inspections by floor and elevation. Photographs, product records and closed-out checks build towards a clear handover pack with certification, warranties and as-built drawings.

Know what's on your building? We'll find out.

We'll review your FRAEW, survey the building and give you a straight answer on scope, cost and programme.